Hospital Deconstruction

R. Baker & Son All Industrial Services, a specialized contractor providing total plant dismantlement, demolition and decommissioning services, recently completed an eight (8) phase, highly technical, demolition and environmental remediation project at Kings County Hospital located in Brooklyn, New York.
R. Baker & Son All Industrial Services, Inc. (R. Baker & Son) was contracted by the client to provide a complete turn-key package which consisted of the complete remove of asbestos containing materials, demolition of three (3) multi-story buildings (one 5-story 100,000 sf building and two 1-story 20,000 sf buildings), removal of all piping, conduit and other related services from underground utility tunnel, demolition of all concrete slabs and foundations, removal of one underground storage tank and one above ground storage tank and then restoration and backfilling of the area.

Prior to any work being performed several pre-demolition and abatement tasks needed to be completed. All utilities were disconnected from the buildings and temporary electric and water lines were installed to facilitate the work. An OSHA engineering survey was completed, notifications were submitted and all permits were obtained. Universal wastes (mercury switches, ballasts, fluorescent light tubes, etc.) were collected, characterized, containerized and the shipped offsite for proper recycling. Proper sidewalk bridges, barricades and fencing were installed to protect the surrounding public and structures. Scaffolding was also installed around the entire 5 story building, including the penthouse. The scaffolding consisted of double plank wood members with 2 ply debris netting.
Demolition and abatement means and methods were carefully evaluated based on several technical factors. Due to the close proximity of surrounding buildings (less than 40 feet) as well as public sidewalks, the building needed to be carefully taken down by hand demolition methods. In addition, there was asbestos flashing that went thru the walls as well asbestos containing waterproofing on the spandrel beams.

In order to evaluate the safest and most efficient means to complete the project, R. Baker & Son utilized the services of a licensed Professional Engineering firm to perform several engineering analysis tasks. The engineer evaluated the structural integrity of the building with respect to the proposed method of demolition as well as an evaluation of floor loading for various pieces of demolition equipment (skid steers and Brokk robotic demolition machines). Utilizing the engineering report as well as input from R. Baker’s internal demolition and asbestos abatement experts, it was decided to perform the work in a phased approach starting from the top and working down. This top down phased approach was also in compliance with NYC variances and ensured that the building was stable throughout the process and did not require any temporary bracing or shoring.

The phased approach to the work was closely coordinated and allowed abatement and demolition to be conducted simultaneously. Working down from the roof, the demolition crews removed all loose items from the floors including desks, cabinets, partitions, etc. Once a floor was completed, the abatement crew would then enter and perform abatement of all non friable asbestos containing materials (ACM). The demolition crew would then come back to remove all sheetrock and drop ceiling so that the abatement personnel could come back in to properly abate the friable asbestos materials (mostly pipe insulation). The wrecking personnel then came back to remove all remaining items and expose the building beams which had ACM waterproofing which then needed to be abated. Finally, once all ACM was properly abated, the demolition work crews went back to the top of the building to manually demolish each floor.

Demolition crews utilized various hand tools to accomplish the demolition as well as specialized demolition equipment which included skid steers with demolition hammer and bucket attachments and Brokk 90 hydraulic breakers. Material was removed from the building via elevator shaft and debris shoots on the outside of the building.

As per NYC rules, Mechanical demolition commenced once the structure had been hand demolished to under two stories in height. R. baker & Son utilized several large 100,000 + hydraulic excavators with demolition attachments (hammers, grapples, pulverizers) to demolish the remaining portions of the main building as well as the two smaller 1 story buildings. Dozers, skid steers and front end loaders were also utilized to facilitate the demolition, sorting and loading efforts.

Once the building was demolished to grade, the slabs and foundations of the subfloor of the main building was also demolished. Care had to be taken to not demolish the sidewalls as these concrete structures needed to remain to provide support for surrounding soils (nearby structures or sidewalks could have been undermined if the soils gave way). Once the slab and foundation were removed, geotextile was then installed with a layer of pea gravel. The remaining portion of the subfloor was backfilled and compacted with clean fill materials back to original grade.

The one UST and one AST were also demolished and removed from the site. The tanks were properly drained and cleaned prior to excavation or removal. The tanks were then cut up on site utilizing an excavator with shear attachment and then sent offsite for scrap metal recycling.

The project was completed in 12 months without incident or injury.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico. The veteran owned company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million). Capabilities include industrial and commercial demolition, rigging,machinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition and warehousing. and demolition contractors in New Jersey

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: http://www.rbaker.com/

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com


 
+ Post a Comment
Comments
Re: Hospital Deconstruction
by goldleaf on Jul 08, 2010
One of the concepts that Mr. Williams talks about is the “work with what you have” principle. In the case of designing the Wesley Room at Reichert House, the materials salvaged are known and can be incorporated into the design of the room – using the strength of the bead board and the aesthetic appeal of vintage accessories. Promotional Products Promotional Products Corporate Gifts
Re: Hospital Deconstruction
by Susancai on Jul 15, 2010
It's a great project. It's happy that it was finished successfully. classified ads |part time jobs|faucets
Re: Hospital Deconstruction
by Le1oem on Jul 19, 2010
Comfortabl y, the article is actually the greatest on this deserving topic. I fit in with your conclusions and will thirstily look forward to your future updates. Just saying thanks will not just be enough, for the extraordinary lucidity in your writing. I will uppdates. Pleasant work and much success in your business dealings! seo
Re: Hospital Deconstruction
by Le1oem on Jul 29, 2010
Demolition complements utilized various applause implements to execute the demolition as well as specialized demolition paraphernalia which included slip manages accompanying demolition beat plus bail supplements further Brokk 90 hydraulic billows. Apparatus was detached from the dwelling way lift handle moreover debris throws on the external of the construction. Freehold Public Houses for sale
Re: Hospital Deconstruction
by Le1oem on Jul 30, 2010
Already the architecture was demolished to rank, the tablets plus endowments of the subfloor of the principal storehouse was yet demolished. Grief had to be taken to negative pulverize the sidewalls as these real edifices needed to endure to cater bear for surrounding blots (convenient compositions or sidewalks could get been undermined if the defiles gave habit). Already the hunk besides root were faraway, geotextile was thereupon installed along a sheet of pea gravel. The remaining ration of the subfloor was backfilled further compacted accompanying decent choke relevants ago to genuine rank. SEO Jobs
Re: Hospital Deconstruction
by Le1oem on Jul 30, 2010
he demolition squad would besides befall abet to dismiss sum sheetrock moreover declivity limit so that the rebate staff could befall tail in to properly lessen the crumbly asbestos informations (mostly spout insulation). The wrecking staff besides came astern to move sum remaining topics also reveal the construction smiles which had ACM waterproofing which thereupon needed to be abated. Vancouver Washington attorneys
Re: Hospital Deconstruction
by Le1oem on Jul 31, 2010
Demolition bands utilized various ovation utensils to execute the demolition as well as specialized demolition rig which included platform guides along demolition pound furthermore tub supplements further Brokk 90 hydraulic billows. Matter was alone from the storehouse per lift axle also debris spears on the exterior of the architecture. At home hair removal
Re: Hospital Deconstruction
by JamesChow on Aug 02, 2010
There are some very great sources here and thank you for being so kind to post them here. So we can read them and give our opinion on subject. Excell Pressure Washer, Husky 1750 pressure washer, Campbell Hausfeld electric pressure washer. Regards, Pressure Washer Reviews
Re: Hospital Deconstruction
by Le1oem on Aug 03, 2010
That is why a pre construction survey is always recommended for the construction of such a useful and public places. Mood Rings
Re: Hospital Deconstruction
by Nathan Chase on Aug 03, 2010
I think it's really sad to see a hospital deconstructed. I don't really have a problem with what you show, but it's just sad thinking about all the people who had been through the hospital. Think about all the babies that were born there who now get to say "oh I was born at ____, it was deconstructed". Or what about those that died. My friend Stephanie Miller died in a hospital that was shortly after destroyed. There was no closure without the hospital being there. It really was sad to see it go. Especially because it's right next to the funeral home. Oh well. I guess it's time for some things to die.
Re: Hospital Deconstruction
by Le1oem on Aug 04, 2010
Demolition squads utilized various pass instruments to transact the demolition as well as specialized demolition rig which included platform pilots accompanying demolition beat moreover cage fondnesss also Brokk 90 hydraulic waves. Pertinent was detached from the dwelling through lift pillar furthermore debris flys on the slim of the construction. red microwaves
Re: Hospital Deconstruction
by Le1oem on Aug 06, 2010
Demolition furthermore rebate maliciouss plus formulas were carefully evaluated based on diverse technical circumstances. Unpaid to the complete propinquity of surrounding storehouses (lower than 40 feet) as well as people sidewalks, the architecture needed to be carefully taken dejected by signature demolition manners. In increase, there was asbestos flashing that went thru the fences as well asbestos containing waterproofing on the spandrel studs. Lamps were also located very nicely but every thing has been removed.
Re: Hospital Deconstruction
by Le1oem on Aug 08, 2010
The demolition retinue would accordingly occur tail to dismiss total sheetrock also descend limit so that the decrease staff could occur abaft in to properly deduct the fragile asbestos importants (mostly flute insulation). Leaky Homes
Re: Hospital Deconstruction
by sswfnhtu on Aug 12, 2010
Say to the ceramic is chinese porcelain, it is not only the most magnificent appearance beautiful, and very big collection value
Re: Hospital Deconstruction
by sswfnhtu on Aug 12, 2010
Pet health to establish in Chicken dog treats, good dog food can guarantee the dog's nutrition
Re: Hospital Deconstruction
by sswfnhtu on Aug 12, 2010
You wrote have been too good, I agreed that your viewpoint, my idea was I likes very much Butterfly valves|steel valve|safety valve |pressure relief valve|dustbin
Re: Hospital Deconstruction
by cosplay on Aug 13, 2010
The Lingerie Store,The lingerie and nightwear SALE at Style Lingerie. All lingerie sale garments marked 30% to 70% off. Sexy lingerie, ladies underwear and designer nightwear lingeri shop Bridal lingerie sexy lingerie Lingerie, sleepwear and intimate apparel is our specialty, ranging from sexy lingerie to bridal lingerie, including corset, bras, thongs and stockings. lingerie sale canon thermos travel mug,canon lens 24-105 mug,canon lens 70-200 mug mugs shop Canno Lens Mug Canno Lens Coffee Mug Nikon Lens Coffee Mug Lens Coffee Mug Canno Lens Coffee Mug, Ceramic Mugs,Nikon Lens mugs,canon thermos travel.Best Discount Mugs provider.
Re: Hospital Deconstruction
by Le1oem on Aug 14, 2010
Demolition squads utilized various help implements to perform the demolition as well as specialized demolition apparatus which included slide leads along demolition beat further pail fondnesss further Brokk 90 hydraulic waves. Cloth was distant from the apartment through lift ray besides debris injects on the slender of the construction. watch movies online
Re: Hospital Deconstruction
by Le1oem on Aug 16, 2010
Total utilities were loose from the dwellings moreover interim electric moreover wet seams were installed to aid the process. An OSHA engineering reconnaissance was completed, notifications were submitted further total sanctions were obtained. Communication Skills Training Broad ravages (mercury switches, stabilizers, fluorescent brighten conduits, etc.) were quiet, characterized, containerized moreover the shipped offsite for respectable recycling. Appropriate sidewalk connects, bars further fencing were installed to fend the surrounding audience further buildings.
Re: Hospital Deconstruction
by Le1oem on Aug 19, 2010
Demolition moreover deduction pettys besides ways were carefully evaluated based on different technical elements. Owing to the adjacent vicinity of surrounding edifices (inferior than 40 feet) as well as populace sidewalks, the dwelling needed to be carefully taken sad by ovation demolition rules. In appendage, there was asbestos flashing that went thru the fortifications as well asbestos containing waterproofing on the spandrel supports. trading penny stocks
Re: Hospital Deconstruction
by moony on Aug 21, 2010
Very interesting article. I agree with one of the commment in particluar, i is very sad to see such an important building demolished. So many memories would have bben created there, many bad but also many very hapy. So strage to see the end of something that has had so much impact on many peoples lives. Thanks for your srticle, it was very intersting and well written. Best Over The Counter Acne Treatment
Re: Hospital Deconstruction
by moony on Aug 21, 2010
Excellent article! It must be an extremely stresfull job and rather dangerous demolishing a huge building. It is sad to see the end of somehting that has stood proudly there for so many years and had saved may peoples lives. Hopefully it was replaced with something better. Thanks for your article! Chin Acne, Weight Loss Diets,Buy Backlinks
Re: Hospital Deconstruction
by lidocool on Aug 21, 2010
Thanks for the post, its really containing the descent knowledge and I really like the blog. Thanks. dui law
Re: Hospital Deconstruction
by lima on Aug 22, 2010
My friends use paypal to receive her payment in online job. I think it's great and simple. Technology make us live better. swimming pool sand filter
beginning bodybuilding
by heathman on Aug 25, 2010
That is a good case study. Thanks for the article. beginning bodybuilding
Re: Hospital Deconstruction
by Le1oem on Aug 26, 2010
Utilizing the engineering report as well as input from R. Baker’s internal demolition and asbestos abatement experts, it was decided to perform the work in a phased approach starting from the top and working down. This top down phased approach was also in compliance with NYC variances and ensured that the building was stable. compare ellipticals
Re: Hospital Deconstruction
by Le1oem on Aug 27, 2010
Utilizing the engineering report as well as input from R. Baker’s internal demolition and asbestos abatement experts, it was decided to perform the work in a phased approach starting from the top and working down. pick up artist reviews
coach purses
by cocokathy90 on Aug 30, 2010

Your article is write very well, I like it very much ~<br>
If you have any needs, they can provide the following for your reference:

supra shoes

supra skytop

supras

louis vuitton outlet

louis vuitton sale

louis vuitton handbags

gucci bags

gucci handbags

gucci outlet

Chanel bags

chanel online

chanel handbags

MBT Shoes

Anti Shoes

MBT Shoes Sale

Coach outlet

coach bags

coach outlet store online

I wish you have a wonderful day!Thank you.

cocokathy90
Re: Hospital Deconstruction
by wong on Aug 31, 2010
someabercrombie london someabercrombie someabercrombie and fitch abercrombie uksave some money アバクロ 銀座 tiffany uksave some money abercrombiesave some money Abercrombie outletsave some money Abercrombie clothingsave some money ed hardy uksave some money love kills slowlysave some money abercrombie outletsave some money abercrombie clothingsave some money abercrombie and fitch uksave some money abercrombie fitch uksave some money Abercrombie & fitch ukis good for you アバクロ 通販is good for you アバクロ 激安is good for you abercrombie ukis good for you abercrombie and fitch ukis good for you Abercrombie & Fitch UKis good for you abercrombie fitch ukis good for you
Re: Hospital Deconstruction
by GenieBump on Sep 01, 2010
Great game, I think it is new to anyone. We can use this game to stimulany our brain. cheap auto insurance
Microsoft Office 2007
by office on Sep 02, 2010
Microsoft Office 2007 Office 2007 Microsoft Office Office 2007 key Office 2007 download Office 2007 Professional Office 2007 home Office Professional 2007 Office ultimate 2007 Microsoft Office 2010 Office 2010 Professional Office 2010 Office 2010 key Office 2010 download Office 2010 Home. office professional 2010 Windows 7 Home
Re: Hospital Deconstruction
by chanel store on Sep 03, 2010
chanel ceramic watch Chanel Handbag chanel shoulder bag Chanel leather handbag Chanel Sunglass coach handbags coco chanel Chanel Handbags chanel watches chanel coco handbags Chanel black bags Chanel Sunglasses http://www.cocoschanel.com/index.php?main_page=site_map
Re: Hospital Deconstruction
by smithkells on Sep 05, 2010
Universal wastes (mercury switches, ballasts, fluorescent light tubes, etc.) were collected, characterized, containerized and the shipped offsite for proper recycling. Proper sidewalk bridges, barricades and fencing were installed to protect the surrounding public and structures. levitra